JERSEY CITY | 75 Park Lane South | FT | 37 FLOORS

How is the crane still not up yet!:joy:

By Nexis4Jersey:

9 Likes

Today

Passed the setback now.

10 Likes

Yesterday. This one has about 10+ floors to go then the crown. I guess they really are doing the whole thing with no crane.

9 Likes

Great updates JC!

2 Likes


@fotosforthefuture

I wonder when glass will appear for either building.

12 Likes

Great image.

I made a gif showcasing your image, and the rendering (for comparison). :blush:

11 Likes

Looks good Chris,

8 Likes

Today from the heights

7 Likes

Today. Looks like they might be just working on the crown at this point. Still no sign of cladding for the main tower but the small Shore development is prepping for cladding now.

image

8 Likes


Lower Jersey City On The Hudson Rv. by Patrick Marella, on Flickr

12 Likes


Credit: FC

10 Likes

How close is it to topping out?

1 Like

@Kevin_Dyer
It has been topped out for awhile now. These were taken today. No sign of cladding for either development though.


8 Likes

I drove by the site again today, and there was a large delivery of facade units. It’s being stored in the lower levels facing Washington BLVD. The facade looks like it will be very high end.

4 Likes

I didn’t get a photo, but if someone who’s nearby can get close, they started cladding on the lower floors.

2 Likes

I think the reason the facade took awhile to start is that there were some material changes to it.

8 Likes

!IMG_20180504_144019|374x500

The facade is getting put on, one panel at a time. Shorehouse next door is also getting ready to receive its facade

9 Likes

nice captures 726!

2 Likes

Today

9 Likes