JERSEY CITY | 75 Park Lane South | FT | 37 FLOORS

That new updated rendering looks pretty good and includes an additional building between the main tower and the ellipse on the next block.

Both sites are being worked on. The smaller site was being cleared today while the much larger site had a large piledriver and some other equipment on site. Looks like they will build both at the same time.

2 Likes

12/22

Main site

Smaller site 1 block east

3 Likes

1/11

5 Likes

This project has really picked up steam all of the sudden.

2/2

Smaller eastern site

Larger western site

3 Likes

The smaller building is called shore house now.

Website

2/17

5 Likes

3/29

5 Likes

4/18

8 Likes

5/17

7 Likes

6 Likes

First floor is up

9 Likes

I believe that’s the tower portion that’s starting to go up in the middle

9 Likes

Wow they made a lot of quick progress all of the sudden. The tower portion should go up quick as well.

75 park lane and shorehouse next door both moving fast.

10 Likes

From a few days ago at the hoboken light rail.

11 Likes

IMG_20171015_174443

Still no crane? Getting taller though

11 Likes

Today

11 Likes

How is the crane still not up yet!:joy:

By Nexis4Jersey:

9 Likes

Today

Passed the setback now.

10 Likes

Yesterday. This one has about 10+ floors to go then the crown. I guess they really are doing the whole thing with no crane.

9 Likes