# JERSEY CITY | 425 Summit Ave | 305 FT | 26 FLOORS

**URL:** <https://forum.newyorkyimby.com/t/jersey-city-425-summit-ave-305-ft-26-floors/17274>\
**Category:** Completed\
**Created:** [September 2, 2020, 4:42pm UTC](https://forum.newyorkyimby.com/t/jersey-city-425-summit-ave-305-ft-26-floors/17274 "2020-09-02T16:42:01Z")\
**Posts on this page:** 20\
**Page:** 1

<div class="post-metadata">

**Author:** ![apophenic](https://avatars.discourse-cdn.com/v4/letter/a/a9adbd/32.png) [@apophenic](https://forum.newyorkyimby.com/u/apophenic)\
**Post date:** [September 2, 2020, 4:42pm UTC](https://forum.newyorkyimby.com/t/jersey-city-425-summit-ave-305-ft-26-floors/17274/1 "2020-09-02T16:42:01Z")

</div>

Proposal to construct a 25-story mixed-use tower on a base structure containing 4,434 square feet of ground floor commercial/retail use, 386 dwelling units, residential amenity space and a parking garage for 51 parking spaces and 200 bicycle spaces.

> **[General Development Application (Preliminary Site Plan) (071720) - Miss JOey.pdf](https://drive.google.com/file/d/1W0tnIO28bGu-pQWUhxIs2N47yhG3YM2v/view?usp=drive_open)**
>
> Google Drive file.

 ![Screen Shot 2020-11-23 at 9.52.57 PM](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/5/6/56d9c62ba71fc3af707a06bf0a010649eadd6543.jpeg)

 ![425-summit-avenue-jersey-city-Elliot-Spitzer-updated (1)](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/2/f/2faf9aebb514bb3ed67d569c0fa9b58939352d84.jpeg) ![425-summit-avenue-jersey-city-rendering-updated (1)](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/3/4/3488d9d2ea4df27bb1e829601420fc18daeb4b61.jpeg)

 ![Screen Shot 2020-11-24 at 2.47.57 PM](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/4/6/463a45c76e44aec576bd5b8c006f2ade63156699.jpeg)

 ![Screen Shot 2020-11-24 at 2.51.29 PM](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/9/4/94671465521909aed9186a9b0efbae69c30e00ce.jpeg)

for the parking lot at the corner of Summit and Sip (the lot on Jones St is no longer part of the application).

 ![Screen Shot 2020-09-02 at 12.50.47 PM](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/2/1/21b67a9443dad898af97eea75e275efcdb8ba91f.png)

---

<div class="post-metadata">

**Author:** ![apophenic](https://avatars.discourse-cdn.com/v4/letter/a/a9adbd/32.png) [@apophenic](https://forum.newyorkyimby.com/u/apophenic)\
**Post date:** [November 24, 2020, 3:00am UTC](https://forum.newyorkyimby.com/t/jersey-city-425-summit-ave-305-ft-26-floors/17274/2 "2020-11-24T03:00:44Z")

</div>

Just updated above with a new rendering. Going before the Planning Board soon.

---

<div class="post-metadata">

**Author:** ![lammius](https://avatars.discourse-cdn.com/v4/letter/l/91b2a8/32.png) [@lammius](https://forum.newyorkyimby.com/u/lammius)\
**Post date:** [November 24, 2020, 4:13am UTC](https://forum.newyorkyimby.com/t/jersey-city-425-summit-ave-305-ft-26-floors/17274/3 "2020-11-24T04:13:54Z")

</div>

A few other tweaks. 26 stories, 275 feet, no office, over 4,000 sf of retail. The lot does not include that “tail” piece over to Jones Street.

---

<div class="post-metadata">

**Author:** ![busybee](https://avatars.discourse-cdn.com/v4/letter/b/cdc98d/32.png) [@busybee](https://forum.newyorkyimby.com/u/busybee)\
**Post date:** [November 24, 2020, 7:05pm UTC](https://forum.newyorkyimby.com/t/jersey-city-425-summit-ave-305-ft-26-floors/17274/4 "2020-11-24T19:05:56Z")

</div>

More renderings/details via Jersey Digs. This is apparently a Spitzer Enterprises project

([Eliot Spitzer’s Company to Pitch High-Rise on Jersey City’s Summit Avenue | Jersey Digs](https://jerseydigs.com/elliot-spitzers-company-to-pitch-high-rise-on-jersey-citys-summit-avenue/))

---

<div class="post-metadata">

**Author:** ![apophenic](https://avatars.discourse-cdn.com/v4/letter/a/a9adbd/32.png) [@apophenic](https://forum.newyorkyimby.com/u/apophenic)\
**Post date:** [November 24, 2020, 8:03pm UTC](https://forum.newyorkyimby.com/t/jersey-city-425-summit-ave-305-ft-26-floors/17274/6 "2020-11-24T20:03:57Z")

</div>

It used to include the tail piece. Thanks for the update. Also the Planning Board application says 25 floors not 26?

---

<div class="post-metadata">

**Author:** ![lammius](https://avatars.discourse-cdn.com/v4/letter/l/91b2a8/32.png) [@lammius](https://forum.newyorkyimby.com/u/lammius)\
**Post date:** [November 25, 2020, 1:17am UTC](https://forum.newyorkyimby.com/t/jersey-city-425-summit-ave-305-ft-26-floors/17274/7 "2020-11-25T01:17:06Z")

</div>

They’re going for 26, and the render shows it.

You’re right that the “tail piece” was once included. I’m told the “tail piece” is destined to be part of a different project that includes the corner lot at Sip/Jones. No further info at this time.

---

<div class="post-metadata">

**Author:** ![Waymond\_Womano](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/waymond_womano/32/7078_2.png) [@Waymond\_Womano](https://forum.newyorkyimby.com/u/Waymond_Womano)\
**Post date:** [January 14, 2021, 8:36pm UTC](https://forum.newyorkyimby.com/t/jersey-city-425-summit-ave-305-ft-26-floors/17274/8 "2021-01-14T20:36:02Z")

</div>

> **[Jersey City Planning Board Approves 26-Story Mixed-Use Tower at 425 Summit...](https://newyorkyimby.com/2021/01/jersey-city-planning-board-approves-26-story-mixed-use-tower-at-425-summit-avenue.html)**
>
> A new 26-story mixed-use tower at 425 Summit Avenue in Journal Square, Jersey City has won approvals from the Jersey City Planning Board.

---

<div class="post-metadata">

**Author:** ![apophenic](https://avatars.discourse-cdn.com/v4/letter/a/a9adbd/32.png) [@apophenic](https://forum.newyorkyimby.com/u/apophenic)\
**Post date:** [September 16, 2021, 9:57pm UTC](https://forum.newyorkyimby.com/t/jersey-city-425-summit-ave-305-ft-26-floors/17274/9 "2021-09-16T21:57:19Z")

</div>

![E_cYH6yWYAceh6t (1)](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/d/4/d4d5e997dedb094c9e8a6bcb3e6b0e0ae5f5a83b.jpeg)

The parking lot is torn up, and there’s an excavator on site. Can’t find a permit application for new construction yet, but there is a permit issued on 9/8/2021 for “INSTALL ONE 800 AMP TEMP SERVICE FOR NEW CONSTRUCTION” … I’d say this one will soon be under construction.

**UPDATE** : They do have a permit application for new construction, though annoyingly it doesn’t appear on the page for 435 Summit. It’s listed under 425 Summit instead. Hasn’t been issued yet.

[https://www.sdlportal.com/towns/nj/hudson/jerseycity/building/permits/167515](https://www.sdlportal.com/towns/nj/hudson/jerseycity/building/permits/167515)

“New construction of Footings and Foundation for new mixed use 26 story 386 unit residential building/ UNDERGROUND CONDUITS FOR ELECTRIC AND PLUMBING. Rolled Plans”

---

<div class="post-metadata">

**Author:** ![the726](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/the726/32/13225_2.png) [@the726](https://forum.newyorkyimby.com/u/the726)\
**Post date:** [September 17, 2021, 12:33am UTC](https://forum.newyorkyimby.com/t/jersey-city-425-summit-ave-305-ft-26-floors/17274/10 "2021-09-17T00:33:33Z")

</div>

Yes, the building name will be under 425 Summit Ave, not 435. Still waiting for the subcode officials to finish their review before they can process the permit. I’d give it until October.

In the meantime, site prep has started and 411 aka 413 Summit should be getting their main building permit in less than a few weeks. So that’s two projects side by side!

---

<div class="post-metadata">

**Author:** ![apophenic](https://avatars.discourse-cdn.com/v4/letter/a/a9adbd/32.png) [@apophenic](https://forum.newyorkyimby.com/u/apophenic)\
**Post date:** [September 17, 2021, 12:35am UTC](https://forum.newyorkyimby.com/t/jersey-city-425-summit-ave-305-ft-26-floors/17274/11 "2021-09-17T00:35:04Z")

</div>

Really appreciate your informative posts!

---

<div class="post-metadata">

**Author:** ![the726](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/the726/32/13225_2.png) [@the726](https://forum.newyorkyimby.com/u/the726)\
**Post date:** [September 17, 2021, 12:40am UTC](https://forum.newyorkyimby.com/t/jersey-city-425-summit-ave-305-ft-26-floors/17274/12 "2021-09-17T00:40:28Z")

</div>

I’m just really lucky I get to be working on a bunch of projects in Jersey City! 🥂 So thanks! Watch out for 345 Baldwin and 711 Montgomery next 👀

---

<div class="post-metadata">

**Author:** ![apophenic](https://avatars.discourse-cdn.com/v4/letter/a/a9adbd/32.png) [@apophenic](https://forum.newyorkyimby.com/u/apophenic)\
**Post date:** [September 17, 2021, 12:59am UTC](https://forum.newyorkyimby.com/t/jersey-city-425-summit-ave-305-ft-26-floors/17274/13 "2021-09-17T00:59:13Z")

</div>

They’ve both already been issued foundation permits. 345 Baldwin is driving piles, but I was confused about the lack of progress on 711 Montgomery. Glad to hear it isn’t stalled!

---

<div class="post-metadata">

**Author:** ![the726](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/the726/32/13225_2.png) [@the726](https://forum.newyorkyimby.com/u/the726)\
**Post date:** [October 14, 2021, 8:19pm UTC](https://forum.newyorkyimby.com/t/jersey-city-425-summit-ave-305-ft-26-floors/17274/14 "2021-10-14T20:19:31Z")

</div>

@apophenic Portal just updated - this job is now a go-ahead for footings and foundation 👀

---

<div class="post-metadata">

**Author:** ![apophenic](https://avatars.discourse-cdn.com/v4/letter/a/a9adbd/32.png) [@apophenic](https://forum.newyorkyimby.com/u/apophenic)\
**Post date:** [October 14, 2021, 9:30pm UTC](https://forum.newyorkyimby.com/t/jersey-city-425-summit-ave-305-ft-26-floors/17274/15 "2021-10-14T21:30:26Z")

</div>

updated! thank you!

---

<div class="post-metadata">

**Author:** ![the726](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/the726/32/13225_2.png) [@the726](https://forum.newyorkyimby.com/u/the726)\
**Post date:** [October 15, 2021, 6:25pm UTC](https://forum.newyorkyimby.com/t/jersey-city-425-summit-ave-305-ft-26-floors/17274/16 "2021-10-15T18:25:41Z")

</div>

![PXL_20211015_163703207.MP](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/b/5/b50c238f7c27145aacdcb2d72d70308d29cc375a.jpeg)  
 ![PXL_20211015_163333885.MP](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/8/f/8f6d6fb4b21962478db9e945be25fce40375f241.jpeg)  
 ![PXL_20211015_163103940.MP](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/e/9/e98dd09cbeaf2a9369a3c007e76795d618f64066.jpeg)

Taken earlier today.

---

<div class="post-metadata">

**Author:** ![Oreo\_Zchut](https://avatars.discourse-cdn.com/v4/letter/o/53a042/32.png) [@Oreo\_Zchut](https://forum.newyorkyimby.com/u/Oreo_Zchut)\
**Post date:** [January 3, 2022, 2:01am UTC](https://forum.newyorkyimby.com/t/jersey-city-425-summit-ave-305-ft-26-floors/17274/17 "2022-01-03T02:01:58Z")

</div>

![](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/5/7/5760398b1f560a0d1f94fc7469b013a600810984.jpeg)

---

<div class="post-metadata">

**Author:** ![Waymond\_Womano](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/waymond_womano/32/7078_2.png) [@Waymond\_Womano](https://forum.newyorkyimby.com/u/Waymond_Womano)\
**Post date:** [May 3, 2022, 6:09pm UTC](https://forum.newyorkyimby.com/t/jersey-city-425-summit-ave-305-ft-26-floors/17274/18 "2022-05-03T18:09:30Z")

</div>

> **[Excavations, Foundations Progress at 425 Summit Avenue in Jersey City, New...](https://newyorkyimby.com/2022/05/excavations-foundations-progress-at-425-summit-avenue-in-jersey-city-new-jersey.html)**
>
> Excavation and foundations are progressing for 425 Summit Avenue, a 26-story tower from Marchetto Higgins Stieve and Spitzer Enterprises in Jersey City.

---

<div class="post-metadata">

**Author:** ![apophenic](https://avatars.discourse-cdn.com/v4/letter/a/a9adbd/32.png) [@apophenic](https://forum.newyorkyimby.com/u/apophenic)\
**Post date:** [June 5, 2022, 12:39am UTC](https://forum.newyorkyimby.com/t/jersey-city-425-summit-ave-305-ft-26-floors/17274/19 "2022-06-05T00:39:23Z")

</div>

Jersey Journal pic (columns starting to rise):

 ![PN4PTDMRY5AC5HRE5D77D43YVE](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/8/b/8b46c77f0f95d6d26ad71dd960f2bc319d259fe1.jpeg)

---

<div class="post-metadata">

**Author:** ![apophenic](https://avatars.discourse-cdn.com/v4/letter/a/a9adbd/32.png) [@apophenic](https://forum.newyorkyimby.com/u/apophenic)\
**Post date:** [June 20, 2022, 9:17pm UTC](https://forum.newyorkyimby.com/t/jersey-city-425-summit-ave-305-ft-26-floors/17274/20 "2022-06-20T21:17:11Z")

</div>

first floor going up

 ![IMG_20220620_134237](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/5/f/5fcd42b1a5980c6a76e460fba283a620e3b6b66f.jpeg)

 ![IMG_20220620_134354](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/7/f/7f015c770bcc07131a144af57b47cb6ac5b44f9f.jpeg)

---

<div class="post-metadata">

**Author:** ![the726](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/the726/32/13225_2.png) [@the726](https://forum.newyorkyimby.com/u/the726)\
**Post date:** [September 10, 2022, 8:18pm UTC](https://forum.newyorkyimby.com/t/jersey-city-425-summit-ave-305-ft-26-floors/17274/22 "2022-09-10T20:18:46Z")

</div>

Tower crane should be going up in October. Had some delays from the utility services but the construction has been full steam ahead.

[Next page](https://forum.newyorkyimby.com/t/jersey-city-425-summit-ave-305-ft-26-floors/17274.md?page=2)
