# Chicago | 1000M (1000 S Michigan Ave) | 805 FT | 73 FLOORS

**URL:** <https://forum.newyorkyimby.com/t/chicago-1000m-1000-s-michigan-ave-805-ft-73-floors/16005>\
**Category:** Completed\
**Created:** [October 24, 2019, 10:15pm UTC](https://forum.newyorkyimby.com/t/chicago-1000m-1000-s-michigan-ave-805-ft-73-floors/16005 "2019-10-24T22:15:33Z")\
**Posts on this page:** 20\
**Page:** 2

<div class="post-metadata">

**Author:** ![TK2000](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/tk2000/32/114212_2.png) [@TK2000](https://forum.newyorkyimby.com/u/TK2000)\
**Post date:** [July 11, 2020, 6:20pm UTC](https://forum.newyorkyimby.com/t/chicago-1000m-1000-s-michigan-ave-805-ft-73-floors/16005/21 "2020-07-11T18:20:31Z")

</div>

Oooh here we go. I had a feeling things would be shut down again, it’s only gonna get worse around this country

---

<div class="post-metadata">

**Author:** ![stache](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/stache/32/30186_2.png) [@stache](https://forum.newyorkyimby.com/u/stache)\
**Post date:** [July 12, 2020, 1:42pm UTC](https://forum.newyorkyimby.com/t/chicago-1000m-1000-s-michigan-ave-805-ft-73-floors/16005/22 "2020-07-12T13:42:14Z")

</div>

It’ll get worse, then better. This is going to take time.

---

<div class="post-metadata">

**Author:** ![Waymond\_Womano](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/waymond_womano/32/7078_2.png) [@Waymond\_Womano](https://forum.newyorkyimby.com/u/Waymond_Womano)\
**Post date:** [July 21, 2020, 11:00pm UTC](https://forum.newyorkyimby.com/t/chicago-1000m-1000-s-michigan-ave-805-ft-73-floors/16005/23 "2020-07-21T23:00:06Z")

</div>

[https://www.chicagoarchitecture.org/2020/07/18/what-a-covid-19-construction-stoppage-looks-like/](https://www.chicagoarchitecture.org/2020/07/18/what-a-covid-19-construction-stoppage-looks-like/)

---

<div class="post-metadata">

**Author:** ![Mackensen](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/mackensen/32/138218_2.png) [@Mackensen](https://forum.newyorkyimby.com/u/Mackensen)\
**Post date:** [August 4, 2020, 4:38pm UTC](https://forum.newyorkyimby.com/t/chicago-1000m-1000-s-michigan-ave-805-ft-73-floors/16005/24 "2020-08-04T16:38:37Z")

</div>

[https://www.chicagoarchitecture.org/2020/08/03/construction-workers-back-at-1000m-after-covid-19-shutdown/?fbclid=IwAR295LP5mdesqx\_rwI8POwyqqzLmObaGHXAAcpMw6h-vfhdUyjo5Ggwc-ao](https://www.chicagoarchitecture.org/2020/08/03/construction-workers-back-at-1000m-after-covid-19-shutdown/?fbclid=IwAR295LP5mdesqx_rwI8POwyqqzLmObaGHXAAcpMw6h-vfhdUyjo5Ggwc-ao)

---

<div class="post-metadata">

**Author:** ![Oatmeal](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/oatmeal/32/22720_2.png) [@Oatmeal](https://forum.newyorkyimby.com/u/Oatmeal)\
**Post date:** [August 13, 2020, 2:50am UTC](https://forum.newyorkyimby.com/t/chicago-1000m-1000-s-michigan-ave-805-ft-73-floors/16005/25 "2020-08-13T02:50:45Z")

</div>

Here’s an update for ya!! 🙂 looks like it’s starting!! 😃

 ![image](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/a/c/ac2901d5f8c73337ca8c11c044cb7c631a13ab81.jpeg)

([@Le Baron](https://skyscraperpage.com/forum/showpost.php?p=8876217&postcount=1546))

---

<div class="post-metadata">

**Author:** ![Waymond\_Womano](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/waymond_womano/32/7078_2.png) [@Waymond\_Womano](https://forum.newyorkyimby.com/u/Waymond_Womano)\
**Post date:** [August 13, 2020, 9:22pm UTC](https://forum.newyorkyimby.com/t/chicago-1000m-1000-s-michigan-ave-805-ft-73-floors/16005/26 "2020-08-13T21:22:35Z")

</div>

I know I’m not supposed to post bad news on these forums. I’m sorry YIMBY. Feel free to delete.

[https://www.chicagoarchitecture.org/2020/08/10/hopes-dashed-michigan-avenue-skyscraper-remains-on-hold/](https://www.chicagoarchitecture.org/2020/08/10/hopes-dashed-michigan-avenue-skyscraper-remains-on-hold/)

---

<div class="post-metadata">

**Author:** ![GSPLover](https://avatars.discourse-cdn.com/v4/letter/g/8c91f0/32.png) [@GSPLover](https://forum.newyorkyimby.com/u/GSPLover)\
**Post date:** [August 13, 2020, 9:58pm UTC](https://forum.newyorkyimby.com/t/chicago-1000m-1000-s-michigan-ave-805-ft-73-floors/16005/27 "2020-08-13T21:58:08Z")

</div>

It’s only the Ostriches that don’t want to see what is really happening.

---

<div class="post-metadata">

**Author:** ![rgarri4](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/rgarri4/32/57140_2.png) [@rgarri4](https://forum.newyorkyimby.com/u/rgarri4)\
**Post date:** [September 15, 2020, 2:04am UTC](https://forum.newyorkyimby.com/t/chicago-1000m-1000-s-michigan-ave-805-ft-73-floors/16005/28 "2020-09-15T02:04:14Z")

</div>

From my 3D model of Chicago

[![](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/5/9/59ea6bb69c6cca9a18a6018e93181b57265f2c3b.jpeg "1000 Michigan inside my 3d Model of Chicago") ](https://www.youtube.com/watch?v=Vz2O_OMJiJU)

---

<div class="post-metadata">

**Author:** ![Mackensen](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/mackensen/32/138218_2.png) [@Mackensen](https://forum.newyorkyimby.com/u/Mackensen)\
**Post date:** [February 10, 2021, 12:35am UTC](https://forum.newyorkyimby.com/t/chicago-1000m-1000-s-michigan-ave-805-ft-73-floors/16005/29 "2021-02-10T00:35:19Z")

</div>

> **[Revised Plans Filed for South Loop's Stalled 1000M Skyscraper - Chicago YIMBY](https://chicagoyimby.com/2021/02/revised-plans-filed-for-south-loops-stalled-1000m-skyscraper.html)**
>
> A zoning variance application was filed late last month for the stalled 1000M skyscraper, located at 1000 S Michigan Avenue in South Loop.

---

<div class="post-metadata">

**Author:** ![DeSelby](https://avatars.discourse-cdn.com/v4/letter/d/df705f/32.png) [@DeSelby](https://forum.newyorkyimby.com/u/DeSelby)\
**Post date:** [February 10, 2021, 8:19pm UTC](https://forum.newyorkyimby.com/t/chicago-1000m-1000-s-michigan-ave-805-ft-73-floors/16005/30 "2021-02-10T20:19:09Z")

</div>

Chicago sure loves height cuts. Frustrating.

---

<div class="post-metadata">

**Author:** ![Emoglez](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/emoglez/32/24448_2.png) [@Emoglez](https://forum.newyorkyimby.com/u/Emoglez)\
**Post date:** [February 10, 2021, 10:56pm UTC](https://forum.newyorkyimby.com/t/chicago-1000m-1000-s-michigan-ave-805-ft-73-floors/16005/31 "2021-02-10T22:56:41Z")

</div>

Let’s just be relieved that it wasn’t that drastic this time.

---

<div class="post-metadata">

**Author:** ![Mackensen](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/mackensen/32/138218_2.png) [@Mackensen](https://forum.newyorkyimby.com/u/Mackensen)\
**Post date:** [February 26, 2021, 10:20pm UTC](https://forum.newyorkyimby.com/t/chicago-1000m-1000-s-michigan-ave-805-ft-73-floors/16005/32 "2021-02-26T22:20:31Z")

</div>

![](https://us1.discourse-cdn.com/flex019/uploads/yimby/original/3X/b/0/b0f543105ee13dc70515e7707650d9ae51a1fb68.jpeg)

> **[Renderings Reveal Updated Design for 1000M at 1000 S Michigan Avenue in South...](https://chicagoyimby.com/2021/02/renderings-reveal-updated-design-for-1000m-at-1000-s-michigan-avenue-in-south-loop.html)**
>
> Renderings have been revealed of the updated design for 1000M, a residential tower located at 1000 S Michigan Avenue in South Loop.

---

<div class="post-metadata">

**Author:** ![YIMHudson](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/yimhudson/32/2304_2.png) [@YIMHudson](https://forum.newyorkyimby.com/u/YIMHudson)\
**Post date:** [February 27, 2021, 12:06am UTC](https://forum.newyorkyimby.com/t/chicago-1000m-1000-s-michigan-ave-805-ft-73-floors/16005/33 "2021-02-27T00:06:11Z")

</div>

a cantlevering 50 West Street

---

<div class="post-metadata">

**Author:** ![Mackensen](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/mackensen/32/138218_2.png) [@Mackensen](https://forum.newyorkyimby.com/u/Mackensen)\
**Post date:** [April 29, 2021, 6:41pm UTC](https://forum.newyorkyimby.com/t/chicago-1000m-1000-s-michigan-ave-805-ft-73-floors/16005/34 "2021-04-29T18:41:45Z")

</div>

4th Ward community meeting

[https://us02web.zoom.us/webinar/register/WN\_F3hZwweXQt-zUrG-LpY6fw](https://us02web.zoom.us/webinar/register/WN_F3hZwweXQt-zUrG-LpY6fw)

---

<div class="post-metadata">

**Author:** ![lemondropmelon](https://avatars.discourse-cdn.com/v4/letter/l/f08c70/32.png) [@lemondropmelon](https://forum.newyorkyimby.com/u/lemondropmelon)\
**Post date:** [May 9, 2021, 9:26pm UTC](https://forum.newyorkyimby.com/t/chicago-1000m-1000-s-michigan-ave-805-ft-73-floors/16005/35 "2021-05-09T21:26:47Z")

</div>

Sure hope this building is finished in memory of Helmut Jahn. Sad passing…

---

<div class="post-metadata">

**Author:** ![Dtuly](https://avatars.discourse-cdn.com/v4/letter/d/e47c2d/32.png) [@Dtuly](https://forum.newyorkyimby.com/u/Dtuly)\
**Post date:** [December 8, 2021, 5:09pm UTC](https://forum.newyorkyimby.com/t/chicago-1000m-1000-s-michigan-ave-805-ft-73-floors/16005/36 "2021-12-08T17:09:21Z")

</div>

^^ Totally agree. Looks like construction is resuming very soon!

> **[Construction to resume at South Loop tower designed by Helmut Jahn](https://www.chicagobusiness.com/residential-real-estate/helmut-jahn-designed-tower-south-loop-resume-construction)**
>
> Fueled by a new $304.5 million construction loan, the developers who shut down work in spring 2020 plan to begin again this month. 

---

<div class="post-metadata">

**Author:** ![Mackensen](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/mackensen/32/138218_2.png) [@Mackensen](https://forum.newyorkyimby.com/u/Mackensen)\
**Post date:** [December 28, 2021, 7:40pm UTC](https://forum.newyorkyimby.com/t/chicago-1000m-1000-s-michigan-ave-805-ft-73-floors/16005/37 "2021-12-28T19:40:18Z")

</div>

> **[Work Resumes On 1000M , Countdown's Fourth Tallest Development - Chicago YIMBY](https://chicagoyimby.com/2021/12/work-resumes-on-1000m-countdowns-fourth-tallest-development.html)**
>
> Resuming into the fourth spot of the 2021 Chicago YIMBY’s year-end countdown is 1000 S Michigan Avenue otherwise known as 1000M in the South Loop.

---

<div class="post-metadata">

**Author:** ![Dtuly](https://avatars.discourse-cdn.com/v4/letter/d/e47c2d/32.png) [@Dtuly](https://forum.newyorkyimby.com/u/Dtuly)\
**Post date:** [January 27, 2022, 3:42pm UTC](https://forum.newyorkyimby.com/t/chicago-1000m-1000-s-michigan-ave-805-ft-73-floors/16005/38 "2022-01-27T15:42:08Z")

</div>

> **[1000M Tower Gears Up to Rise in South Loop - Chicago YIMBY](https://chicagoyimby.com/2022/01/concrete-pour-for-1000m-tower-goes-full-throttle-in-south-loop.html)**
>
> Concrete has been poured for 1000M, a 73-story apartment tower in South Loop that ranks as Chicago's fourth tallest active construction development.

---

<div class="post-metadata">

**Author:** ![Dtuly](https://avatars.discourse-cdn.com/v4/letter/d/e47c2d/32.png) [@Dtuly](https://forum.newyorkyimby.com/u/Dtuly)\
**Post date:** [February 11, 2022, 4:29pm UTC](https://forum.newyorkyimby.com/t/chicago-1000m-1000-s-michigan-ave-805-ft-73-floors/16005/39 "2022-02-11T16:29:50Z")

</div>

> **[1000M lands full building permit](https://chicago.urbanize.city/post/1000m-lands-full-building-permit)**
>
> A full building permit has been issued for 1000M, a 74-story luxury apartment tower at 1000 S. Michigan Ave in the South Loop. Ready to go vertical, McHugh Concrete, the concrete subcontractor for McHugh Construction, recently completed a nine-hour...

This project is definitely one of my favorites going up right now. The only negative is the 300-car parking garage, as it’s less than 0.5 miles to red, orange, and green lines

---

<div class="post-metadata">

**Author:** ![stache](https://sea1.discourse-cdn.com/flex019/user_avatar/forum.newyorkyimby.com/stache/32/30186_2.png) [@stache](https://forum.newyorkyimby.com/u/stache)\
**Post date:** [February 13, 2022, 8:06am UTC](https://forum.newyorkyimby.com/t/chicago-1000m-1000-s-michigan-ave-805-ft-73-floors/16005/40 "2022-02-13T08:06:45Z")

</div>

It’s expensive enough that people are going to want to have a car for trips out of town, groceries etc.

[Previous page](https://forum.newyorkyimby.com/t/chicago-1000m-1000-s-michigan-ave-805-ft-73-floors/16005.md?page=1)

[Next page](https://forum.newyorkyimby.com/t/chicago-1000m-1000-s-michigan-ave-805-ft-73-floors/16005.md?page=3)
