# RALEIGH

**URL:** https://forum.newyorkyimby.com/c/raleigh/72.md

[Latest](https://forum.newyorkyimby.com/latest.md) · [Categories](https://forum.newyorkyimby.com/categories.md)

---

## [About the RALEIGH category](https://forum.newyorkyimby.com/t/about-the-raleigh-category/21363)

<div class="topic-metadata">

**Author:** [@Mackensen](https://forum.newyorkyimby.com/u/Mackensen)\
**Replies:** 0

</div>

(Replace this first paragraph with a brief description of your new category. This guidance will appear in the category selection area, so try to keep it below 200 characters.) Use the following paragraphs for a longer d…

---

## [RALEIGH | Hotel + Residential Tower | FT ? | 40 FLOORS?](https://forum.newyorkyimby.com/t/raleigh-hotel-residential-tower-ft-40-floors/21110)

<div class="topic-metadata">

**Author:** [@Mitch\_NC](https://forum.newyorkyimby.com/u/Mitch_NC)\
**Replies:** 7\
**Last updated:** [September 27, 2026, 6:37pm UTC](https://forum.newyorkyimby.com/t/raleigh-hotel-residential-tower-ft-40-floors/21110 "2026-09-27T18:37:49Z")

</div>

Hopefully this is the right place for this. The City of Raleigh will soon re-open a request for RFPs for 2 adjacent sites on Fayetteville St. The RFP request process was previously opened in early 2020, but was sideline…

---

## [RALEIGH | City Hall / East Civic Tower | 265 FT | 17 FLOORS](https://forum.newyorkyimby.com/t/raleigh-city-hall-east-civic-tower-265-ft-17-floors/24910)

<div class="topic-metadata">

**Author:** [@Mitch\_NC](https://forum.newyorkyimby.com/u/Mitch_NC)\
**Replies:** 2\
**Last updated:** [April 2, 2026, 8:27pm UTC](https://forum.newyorkyimby.com/t/raleigh-city-hall-east-civic-tower-265-ft-17-floors/24910 "2026-04-02T20:27:30Z")

</div>

I’ve been delinquent on posting Raleigh updates Our new City Hall is underway State as of Sep 4th: Render of the final build-out

---

## [RALEIGH | The Creamery (414 Glenwood Ave) | 399 FT | 37 FLOORS](https://forum.newyorkyimby.com/t/raleigh-the-creamery-414-glenwood-ave-399-ft-37-floors/24965)

<div class="topic-metadata">

**Author:** [@Mitch\_NC](https://forum.newyorkyimby.com/u/Mitch_NC)\
**Replies:** 2\
**Last updated:** [March 26, 2026, 8:02pm UTC](https://forum.newyorkyimby.com/t/raleigh-the-creamery-414-glenwood-ave-399-ft-37-floors/24965 "2026-03-26T20:02:25Z")

</div>

Overview Phase 1 306 apartments ~7,500 sqft retail Phase 2 300 residential units or 300,000 square feet of commercial space Preserves the existing Pine State Creamery dairy factory building Phase 1 Phase 1 +…

---

## [RALEIGH | LOW-RISE / GENERAL Development News + Construction](https://forum.newyorkyimby.com/t/raleigh-low-rise-general-development-news-construction/24024)

<div class="topic-metadata">

**Author:** [@Mitch\_NC](https://forum.newyorkyimby.com/u/Mitch_NC)\
**Replies:** 9\
**Last updated:** [March 26, 2026, 8:00pm UTC](https://forum.newyorkyimby.com/t/raleigh-low-rise-general-development-news-construction/24024 "2026-03-26T20:00:20Z")

</div>

This thread is designated for miscellaneous low-rise projects of any stage in development. At YIMBY, low-rises are considered buildings of less then 10 stories (100 feet). Projects of 10 or more stories (100+ feet) are d…

---

## [RALEIGH | The Strand | 265 FT | 20 FLOORS](https://forum.newyorkyimby.com/t/raleigh-the-strand-265-ft-20-floors/24966)

<div class="topic-metadata">

**Author:** [@Mitch\_NC](https://forum.newyorkyimby.com/u/Mitch_NC)\
**Replies:** 0\
**Last updated:** [October 7, 2025, 10:14pm UTC](https://forum.newyorkyimby.com/t/raleigh-the-strand-265-ft-20-floors/24966 "2025-10-07T22:14:55Z")

</div>

Overview 362 units 9,000 sqft retail

---

## [RALEIGH | The Weld | 265 FT | 20 FLOORS](https://forum.newyorkyimby.com/t/raleigh-the-weld-265-ft-20-floors/23774)

<div class="topic-metadata">

**Author:** [@Mitch\_NC](https://forum.newyorkyimby.com/u/Mitch_NC)\
**Replies:** 3\
**Last updated:** [October 7, 2025, 10:00pm UTC](https://forum.newyorkyimby.com/t/raleigh-the-weld-265-ft-20-floors/23774 "2025-10-07T22:00:46Z")

</div>

https://www.axios.com/local/raleigh/2023/06/06/sli-capital-towers-residential-financing-dix-park Phase 1 (under construction) is two 20-story towers with 675 apartment units Phase 2 was originally supposed to bring …

---

## [RALEIGH | Union Station Tower and Transit Center | 414 FT | 35 FLOORS](https://forum.newyorkyimby.com/t/raleigh-union-station-tower-and-transit-center-414-ft-35-floors/21353)

<div class="topic-metadata">

**Author:** [@Mitch\_NC](https://forum.newyorkyimby.com/u/Mitch_NC)\
**Replies:** 11\
**Last updated:** [August 2, 2025, 12:41pm UTC](https://forum.newyorkyimby.com/t/raleigh-union-station-tower-and-transit-center-414-ft-35-floors/21353 "2025-08-02T12:41:28Z")

</div>

http://rusbusnc.com/ Upcoming redevelopment of aging warehouse space into a mix-use development: a downtown transit center, wrapped with retail and topped with apartments and hotel rooms.

---

## [RALEIGH | 320 W South St | 213 FT | 20 FLOORS](https://forum.newyorkyimby.com/t/raleigh-320-w-south-st-213-ft-20-floors/24025)

<div class="topic-metadata">

**Author:** [@Mitch\_NC](https://forum.newyorkyimby.com/u/Mitch_NC)\
**Replies:** 1\
**Last updated:** [November 4, 2024, 9:08pm UTC](https://forum.newyorkyimby.com/t/raleigh-320-w-south-st-213-ft-20-floors/24025 "2024-11-04T21:08:33Z")

</div>

This project is nearing completion 295 apartments Ground-floor restaurant / retail space

---

## [RALEIGH | 400 Hillsborough St | 220 FT? | 20 FLOORS](https://forum.newyorkyimby.com/t/raleigh-400-hillsborough-st-220-ft-20-floors/21354)

<div class="topic-metadata">

**Author:** [@Mitch\_NC](https://forum.newyorkyimby.com/u/Mitch_NC)\
**Replies:** 4\
**Last updated:** [June 19, 2023, 9:43pm UTC](https://forum.newyorkyimby.com/t/raleigh-400-hillsborough-st-220-ft-20-floors/21354 "2023-06-19T21:43:15Z")

</div>

16,500 square feet of retail space 129,000 square feet of office space 220 residential units

---

## [RALEIGH | New Soccer Stadium](https://forum.newyorkyimby.com/t/raleigh-new-soccer-stadium/22116)

<div class="topic-metadata">

**Author:** [@007](https://forum.newyorkyimby.com/u/007)\
**Replies:** 0\
**Last updated:** [November 17, 2022, 3:35pm UTC](https://forum.newyorkyimby.com/t/raleigh-new-soccer-stadium/22116 "2022-11-17T15:35:30Z")

</div>

---

## [RALEIGH | 330 W Hargett St | ~360 FT | 30 FLOORS](https://forum.newyorkyimby.com/t/raleigh-330-w-hargett-st-360-ft-30-floors/21635)

<div class="topic-metadata">

**Author:** [@Mitch\_NC](https://forum.newyorkyimby.com/u/Mitch_NC)\
**Replies:** 0\
**Last updated:** [August 9, 2022, 7:11pm UTC](https://forum.newyorkyimby.com/t/raleigh-330-w-hargett-st-360-ft-30-floors/21635 "2022-08-09T19:11:49Z")

</div>

Construction slated to begin early 2023. This is a redevelopment of a currently 1-story building downtown. 372 apartments 17k sqft of ground-floor retail (restaurant) space

---

## [RALEIGH | Midtown Exchange](https://forum.newyorkyimby.com/t/raleigh-midtown-exchange/21397)

<div class="topic-metadata">

**Author:** [@007](https://forum.newyorkyimby.com/u/007)\
**Replies:** 1\
**Last updated:** [August 9, 2022, 5:37pm UTC](https://forum.newyorkyimby.com/t/raleigh-midtown-exchange/21397 "2022-08-09T17:37:22Z")

</div>

https://www.bizjournals.com/triangle/news/2019/11/14/plans-unveiled-for-1-billion-development-in.html

---

## [RALEIGH | Smokey Hollow Phase 3 | ft | fl](https://forum.newyorkyimby.com/t/raleigh-smokey-hollow-phase-3-ft-fl/21396)

<div class="topic-metadata">

**Author:** [@007](https://forum.newyorkyimby.com/u/007)\
**Replies:** 0\
**Last updated:** [June 11, 2022, 4:21pm UTC](https://forum.newyorkyimby.com/t/raleigh-smokey-hollow-phase-3-ft-fl/21396 "2022-06-11T16:21:15Z")

</div>

https://dtraleigh.com/2019/05/smokey-hollow-phase-3-wants-to-bring-signature-tower-to-peace-street/

---

## [RALEIGH | Downtown South District | 7-40 FLOORS (20+ buildings)](https://forum.newyorkyimby.com/t/raleigh-downtown-south-district-7-40-floors-20-buildings/21355)

<div class="topic-metadata">

**Author:** [@Mitch\_NC](https://forum.newyorkyimby.com/u/Mitch_NC)\
**Replies:** 3\
**Last updated:** [June 1, 2022, 4:55pm UTC](https://forum.newyorkyimby.com/t/raleigh-downtown-south-district-7-40-floors-20-buildings/21355 "2022-06-01T16:55:51Z")

</div>

Construction has started on the first phase of Downtown South. 20+ buildings ranging from 7 to 40 stories are anticipated at completion (expected to take 10-15 years). The site abuts a future BRT route, and a greenway/bi…
